What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £5.18 |
| 2 | EDFE Aggregate N Scot 1 | £4.42 |
| 3 | Hirwaun | £4.34 |
| 4 | Arbroath | £4.20 |
| 5 | West Burton B 2 | £4.05 |
| Region | £/MWh |
|---|---|
| South Wales | £4.3 |
| North Scotland | £4.2 |