What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Roaring Hill | £6.33 |
| 2 | Immingham CHP | £6.11 |
| 3 | Blackpool | £5.38 |
| 4 | Jamesfield 2 | £5.38 |
| 5 | Carrington Ltd - 1 | £5.11 |
| 6 | EDFE Aggregate S Eng 02 | £5.09 |
| 7 | West Burton B 2 | £4.93 |
| Region | £/MWh |
|---|---|
| South Scotland | £6.3 |
| North Scotland | £5.4 |