What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Blackpool | £27.32 |
| 2 | Staythorpe 1 | £20.10 |
| 3 | Grain | £16.78 |
| 4 | Grain | £16.77 |
| 5 | Cottam Development Centre | £16.01 |
| 6 | SSE Energy Supply #01 | £13.53 |
| 7 | Fasnakyle G3 | £12.43 |