What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 46 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ocker Hill | £8.65 |
| 2 | Centrica Business Solutions S05L | £7.28 |
| 3 | Statkraft Markets #06 | £5.56 |
| 4 | Enfield Centre Ltd BMU1 | £5.09 |
| 5 | Pen y Cymoedd | £4.85 |
| Region | £/MWh |
|---|---|
| Midlands | £8.6 |
| South Wales | £4.8 |