What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £20.23 |
| 2 | Carnegie Road 1 | £19.90 |
| 3 | Native River | £18.41 |
| 4 | Enfield Centre Ltd BMU1 | £18.38 |
| 5 | Unit 1 | £17.20 |
| 6 | SSE Energy Supply #01 | £16.90 |
| 7 | Carrington Ltd - 1 | £16.56 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £19.9 |
| South Western | £18.4 |