What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £139.32 |
| 2 | Immingham CHP | £118.81 |
| 3 | Shoreham | £110.57 |
| 4 | Coryton | £105.87 |
| 5 | Carrington Ltd - 1 | £85.92 |
| 6 | West Burton B 3 | £59.24 |