What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £64.46 |
| 2 | Broadditch | £61.76 |
| 3 | Wormald Green | £59.39 |
| 4 | Limejump Energy #05 | £56.58 |
| Region | £/MWh |
|---|---|
| South Eastern | £61.8 |
| Northern | £59.4 |