What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £280.14 |
| 2 | Octopus Energy #00 | £237.67 |
| 3 | Didcot B main 5 | £169.68 |
| 4 | Pembroke 31 | £168.46 |
| 5 | Pembroke 51 | £168.46 |