What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Octopus Energy #00 | £62.64 |
| 2 | Coupar | £29.54 |
| 3 | Ocker Hill | £28.61 |
| Region | £/MWh |
|---|---|
| North Scotland | £29.5 |
| Midlands | £28.6 |