What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Roaring Hill | £9.60 |
| 2 | Jamesfield 2 | £8.25 |
| 3 | Peterhead Block 1 | £8.22 |
| Region | £/MWh |
|---|---|
| South Scotland | £9.6 |
| North Scotland | £8.3 |