What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 47 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #02 | £187.33 |
| 2 | Limejump Energy #05 | £187.31 |
| 3 | Richborough Park 2 | £187.30 |
| Region | £/MWh |
|---|---|
| South Eastern | £187.3 |