What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Drax | £22.06 |
| 2 | Drax | £22.06 |
| 3 | Immingham CHP | £21.46 |
| 4 | Zenobe Capenhurst #1 | £17.53 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £17.5 |