What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £2.25 |
| 2 | Immingham CHP | £1.97 |
| 3 | Rocksavage | £1.52 |
| 4 | Langage | £0.88 |
| 5 | F & S Energy #02 | £0.80 |
| 6 | Native River | £0.76 |
| 7 | Pen y Cymoedd | £0.75 |
| Region | £/MWh |
|---|---|
| South Western | £0.8 |
| South Wales | £0.8 |
| Merseyside and North Wales | £0.7 |