What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £46.11 |
| 2 | Marchwood | £39.67 |
| 3 | KGL 1 | £32.89 |
| 4 | Rocksavage | £28.60 |
| 5 | Unit 3 | £28.51 |