What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £236.42 |
| 2 | Marchwood | £234.00 |
| 3 | Didcot B main 5 | £232.38 |
| 4 | West Burton B 3 | £215.12 |
| 5 | Unit 3 | £200.75 |
| 6 | Coryton | £196.63 |
| 7 | F & S Energy #02 | £183.18 |