What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £1.80 |
| 2 | SSE Energy Supply #01 | £1.50 |
| 3 | Cottam Development Centre | £1.46 |
| 4 | Coryton | £1.44 |
| 5 | Rocksavage | £1.43 |
| 6 | Enfield Centre Ltd BMU1 | £1.41 |
| 7 | Damhead Creek | £1.41 |