What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £24.65 |
| 2 | SOUTH HUMBER BANK P/S | £19.08 |
| 3 | Langage | £19.04 |
| 4 | Pembroke 11 | £18.50 |
| 5 | Unit 3 | £17.85 |
| 6 | Coryton | £16.90 |
| 7 | F & S Energy #02 | £16.14 |
| Region | £/MWh |
|---|---|
| South Wales | £15.3 |