What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £19.09 |
| 2 | Pembroke 41 | £18.83 |
| 3 | Pembroke 21 | £13.30 |
| 4 | Keadby-2 Main | £10.09 |
| 5 | Unit 1 | £6.91 |