What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £9.38 |
| 2 | Marchwood | £9.00 |
| 3 | Unit 1 | £7.69 |
| 4 | Pen y Cymoedd | £6.33 |
| 5 | Cottam Development Centre | £5.69 |
| 6 | Kings Lynn A | £5.12 |
| 7 | West Burton B 3 | £5.12 |
| Region | £/MWh |
|---|---|
| South Wales | £6.3 |