What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £11.52 |
| 2 | Hawthorn Pit | £11.49 |
| 3 | Dinorwig | £9.83 |
| 4 | Keadby-2 Main | £7.62 |
| 5 | Statkraft Markets #05 | £7.52 |
| 6 | Marchwood | £5.48 |
| 7 | Limejump Energy #04 | £4.99 |
| Region | £/MWh |
|---|---|
| Northern | £11.5 |