What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Port of Tyne | £11.79 |
| 2 | F & S Energy #01 | £11.62 |
| 3 | Bloxwich | £11.25 |
| 4 | Coryton | £9.09 |