What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £695.00 |
| 2 | Spalding | £634.82 |
| 3 | Statkraft Markets #02 | £559.38 |
| 4 | Pivot Bustleholme | £543.65 |
| 5 | Staythorpe 1 | £538.14 |
| 6 | Cowley | £522.02 |
| Region | £/MWh |
|---|---|
| Midlands | £543.6 |
| South Eastern | £522.0 |