What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SSE Energy Supply #01 | £13.87 |
| 2 | Unit 1 | £4.40 |
| 3 | Wormald Green | £3.25 |
| 4 | F & S Energy #01 | £2.81 |
| 5 | Port of Tyne | £2.63 |
| 6 | West Burton B 2 | £2.55 |
| Region | £/MWh |
|---|---|
| Northern | £3.1 |