What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £181.97 |
| 2 | Staythorpe 3 | £181.95 |
| 3 | Damhead Creek | £174.99 |
| 4 | Rocksavage | £168.04 |