What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 21 | £26.75 |
| 2 | Rocksavage | £15.95 |
| 3 | Statkraft Markets #01 | £15.79 |
| 4 | Port of Tyne | £14.63 |
| 5 | Coryton | £14.57 |
| 6 | Bloxwich | £14.54 |
| 7 | Centrica Business Solutions S06B | £14.50 |
| Region | £/MWh |
|---|---|
| Northern | £14.6 |
| Midlands | £14.5 |
| South Wales | £13.1 |