What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £8.22 |
| 2 | Seabank Module 2 | £6.85 |
| 3 | Richborough Park 1 | £5.78 |
| 4 | Richborough Park 2 | £5.78 |
| 5 | Rocksavage | £5.49 |
| 6 | Limejump Energy #03 | £5.23 |
| 7 | Limejump Energy #01 | £5.22 |
| Region | £/MWh |
|---|---|
| South Eastern | £5.8 |