What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £1.54 |
| 2 | Grain | £1.48 |
| 3 | Seabank Module 2 | £1.43 |
| 4 | Hawthorn Pit | £1.43 |
| Region | £/MWh |
|---|---|
| South Eastern | £1.5 |
| Northern | £1.4 |