What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 2 | £4.82 |
| 2 | Roaring Hill | £4.40 |
| 3 | Shoreham | £3.92 |
| Region | £/MWh |
|---|---|
| North Scotland | £4.8 |
| South Scotland | £4.4 |