What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £2.44 |
| 2 | Dong Severn Ut 10 | £2.06 |
| 3 | SOUTH HUMBER BANK P/S | £2.00 |
| 4 | Cottam Development Centre | £2.00 |
| 5 | West Burton B 1 | £1.91 |
| 6 | THURROCK STORAGE #3 | £1.83 |
| Region | £/MWh |
|---|---|
| South Eastern | £1.8 |