What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | KGL 1 | £530.86 |
| 2 | GridBeyond L0DN | £503.18 |
| 3 | Exergy Solutions E00E | £476.36 |
| 4 | SOUTH HUMBER BANK P/S | £461.63 |
| 5 | Unit 2 | £447.76 |
| 6 | Dong Severn Ut 10 | £374.04 |