What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £17.68 |
| 2 | Marchwood | £17.15 |
| 3 | Didcot B main 5 | £16.00 |
| 4 | Dong Severn Ut 10 | £15.71 |
| 5 | Exergy Solutions E00E | £12.00 |
| 6 | Langage | £12.00 |
| 7 | KGL 1 | £10.97 |