What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Richborough Park 1 | £0.46 |
| 2 | Richborough Park 2 | £0.45 |
| 3 | Grain | £0.45 |
| 4 | Limejump Energy #02 | £0.44 |
| 5 | Limejump Energy #01 | £0.44 |
| 6 | Langage | £0.43 |
| 7 | SOUTH HUMBER BANK P/S | £0.43 |
| Region | £/MWh |
|---|---|
| South Eastern | £0.5 |