What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #2 | £12.06 |
| 2 | Jamesfield 1 | £10.82 |
| 3 | Roaring Hill | £9.81 |
| Region | £/MWh |
|---|---|
| South Eastern | £12.1 |
| North Scotland | £10.8 |
| South Scotland | £9.8 |