What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £5.63 |
| 2 | Centrica Business Solutions S06B | £5.12 |
| 3 | Roosecote | £5.00 |
| 4 | Wishaw | £4.96 |
| 5 | GridBeyond L0DN | £4.87 |
| 6 | Flexitricity #01 | £4.40 |
| 7 | Cruachan | £4.36 |
| Region | £/MWh |
|---|---|
| North Western | £5.0 |
| South Scotland | £5.0 |