What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Roaring Hill | £7.35 |
| 2 | Jamesfield 1 | £6.31 |
| 3 | Coupar | £6.30 |
| 4 | Byers Brae | £6.14 |
| 5 | GridBeyond L0DN | £4.35 |
| Region | £/MWh |
|---|---|
| South Scotland | £7.1 |
| North Scotland | £6.3 |