What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | West Burton B 1 | £8.89 |
| 2 | Unit 2 | £7.59 |
| 3 | Centrica Business Solutions S05L | £5.58 |
| 4 | THURROCK STORAGE #1 | £5.56 |
| 5 | GridBeyond L0DN | £5.12 |
| 6 | Dinorwig | £4.39 |
| 7 | Shoreham | £3.81 |
| Region | £/MWh |
|---|---|
| South Eastern | £5.6 |