What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Damhead Creek | £247.51 |
| 2 | Great Yarmouth | £247.13 |
| 3 | Didcot B main 6 | £240.27 |
| 4 | Didcot B main 5 | £231.10 |
| 5 | Kings Lynn A | £217.25 |
| 6 | GridBeyond L0DN | £210.41 |
| 7 | Carrington Ltd - 2 | £194.33 |