What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £18.86 |
| 2 | GridBeyond L0DN | £12.85 |
| 3 | Arbroath | £11.38 |
| 4 | Coupar | £11.35 |
| 5 | Bloxwich | £9.43 |
| 6 | Byers Brae | £9.30 |
| 7 | Carnegie Road 1 | £8.35 |
| Region | £/MWh |
|---|---|
| North Scotland | £11.4 |
| Midlands | £9.4 |
| South Scotland | £9.3 |
| Merseyside and North Wales | £8.3 |