What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £4.78 |
| 2 | Marchwood | £4.53 |
| 3 | Keadby-2 Main | £4.49 |
| 4 | Statkraft Markets #06 | £4.20 |