What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module | £14.36 |
| 2 | Pembroke 21 | £12.88 |
| 3 | Cottam Development Centre | £8.88 |
| 4 | SOUTH HUMBER BANK P/S | £8.45 |
| 5 | Hawthorn Pit | £5.01 |
| 6 | Wormald Green | £4.59 |
| 7 | Native River | £4.11 |
| Region | £/MWh |
|---|---|
| Northern | £5.0 |
| South Western | £4.1 |