What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module | £2999.94 |
| 2 | Staythorpe 1 | £2999.94 |
| 3 | Flexitricity X09A | £2995.43 |
| 4 | Carrington Ltd - 1 | £2995.00 |
| 5 | Carrington Ltd - 2 | £2995.00 |