What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 51 | £5.13 |
| 2 | Seabank Module | £5.09 |
| 3 | Flexitricity X09A | £2.42 |
| 4 | Carrington Ltd - 1 | £2.15 |
| 5 | Carrington Ltd - 2 | £2.15 |