What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £6.25 |
| 2 | Shoreham | £4.27 |
| 3 | Spalding | £3.77 |
| 4 | Drax Energy Solutions #02 | £3.50 |
| 5 | Carrington Ltd - 2 | £3.17 |
| 6 | Carrington Ltd - 1 | £2.93 |
| 7 | SOUTH HUMBER BANK P/S | £2.88 |