What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SOUTH HUMBER BANK P/S | £20.62 |
| 2 | Coryton | £15.44 |
| 3 | Spalding | £12.00 |
| 4 | Carrington Ltd - 1 | £10.32 |
| 5 | Brigg DG | £8.59 |
| 6 | Peterborough 3 | £8.59 |
| 7 | EDFE Aggregate S Scot 2 | £8.11 |