What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £5.47 |
| 2 | F & S Energy #01 | £4.00 |
| 3 | Hawthorn Pit | £3.69 |
| 4 | Wormald Green | £3.61 |
| 5 | Damhead Creek | £2.66 |
| 6 | Pen y Cymoedd | £2.17 |
| Region | £/MWh |
|---|---|
| Northern | £3.6 |
| South Wales | £2.2 |