What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £35.87 |
| 2 | Limejump Energy #03 | £32.21 |
| 3 | Richborough Park 1 | £30.29 |
| 4 | Richborough Park 2 | £28.31 |
| 5 | Limejump Energy #02 | £24.16 |
| 6 | Drax | £23.79 |
| Region | £/MWh |
|---|---|
| South Eastern | £29.3 |