What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #03 | £13.22 |
| 2 | Limejump Energy #04 | £13.00 |
| 3 | Coryton | £12.28 |
| 4 | Richborough Park 2 | £11.87 |
| 5 | Richborough Park 1 | £11.35 |
| 6 | Carrington Ltd - 2 | £10.54 |
| 7 | Limejump Energy #02 | £10.48 |
| Region | £/MWh |
|---|---|
| South Eastern | £11.5 |