What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £38.31 |
| 2 | Coryton | £19.27 |
| 3 | Grain | £18.46 |
| 4 | Damhead Creek | £17.99 |
| 5 | Shoreham | £17.99 |