What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module | £66.00 |
| 2 | Peterhead Block 1 | £56.00 |
| 3 | Pembroke 51 | £35.50 |
| 4 | EDFE Aggregate S Scot 2 | £33.49 |
| 5 | EDFE Aggregate S Scot 3 | £33.49 |
| 6 | EDFE Aggregate NW Eng 3 | £33.49 |
| 7 | Carrington Ltd - 1 | £32.20 |