What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 21 | £40.10 |
| 2 | Unit 2 | £20.20 |
| 3 | Damhead Creek | £19.42 |
| 4 | Seabank Module | £15.28 |
| 5 | Flexitricity #02 | £12.80 |
| 6 | Brigg DG | £11.97 |
| 7 | Peterborough 3 | £11.97 |